Total Energies (Houston/UAE/Egypt)

DURATION: January 2023 – Present | Role: Fabrication Site Manager Project: GOLFINHO Field Subsea Structures | Mozambique LNG Project

​​

  1. Managed fabrication of over 80 subsea structures, including Pipeline End Terminations (PLETs), In-Line Tees (ILTs), and manifold piles.

  2. Led Factory Acceptance Tests (FATs) and System Integration Tests (SITs), ensuring functionality and performance.

  3. Mitigated risks and optimized project sequencing for seamless execution.

  4. Successfully coordinated transport and loadout of fabricated structures to the Mozambique offshore field.

Formosa 2 Wind Farm Power Company

DURATION: December 2021 – December 2022 | Role: Lead / Fabrication Site Manager | Location: Karimun Island & Batam Island, Indonesia

​​

​

  1. Leadership & Project Coordination: Promoted to lead the Foundation Supply Package, overseeing fabrication, testing, and loadout operations, ensuring timely and accurate delivery of 47 jackets and transition pieces to meet stringent project timelines.

  2. Compliance & Documentation: Directed compliance efforts for loadout procedures and approvals, including critical RFLO certificates.

  3. Conducted Go/No-Go meetings and led the final documentation closeout, ensuring adherence to all technical and quality requirements

  4. .Cross-Functional Collaboration: Coordinated closely with stakeholders across fabrication yards, vendors, and the client’s team, driving seamless operations and resolving issues to avoid delays.

  5. Additional Oversight: Managed the fabrication of the new pin-pile package at EEW facilities in South Korea, leading the project from HAZID reviews to final documentation completion.

WhatsApp Image 2025-07-24 at 11.25.32 AM.jpeg
WhatsApp Image 2025-07-24 at 11.21.26 AM.jpeg

Formosa 2 Wind Farm Power Company 

DURATION: August 2021 – December 2021 | Role: Fabrication Site Manager | Location: Karimun Island , Indonesia

​​

  1. Project Delivery & Management: Managed the end-to-end process of fabrication, commissioning, and loadout, ensuring the timely delivery of 32 jackets with 14 shipments to Taiwan.Safety & Quality Assurance:

  2. Led QHSE initiatives, including safety audits, walkarounds, and Go-No-Go meetings for high-risk activities such as lifting and jacket upending.Collaboration with EPC Contractors:

  3. Engaged regularly with the EPC contractor to address resource shortages, mitigate delays, and ensure that all operations aligned with project codes and standards.Health & Safety:

  4. Played an active role in HSE management through participation in HAZOP/HAZID meetings and ongoing safety communication with teams, ensuring a zero-incident project environment.

TOTAL E&P – TEG Construction

DURATION: February 2020 – May 2021 | Role: Manager / Interim Project Manager | project: Tyra Redevelopment Project | Location: Batam Island, Indonesia

  1. Directed the entire fabrication, construction, and loadout process, ensuring work met safety and quality standards.

  2. Led risk assessments, HAZOP/HAZID sessions, and weekly safety meetings to promote a culture of safety and operational excellence.

  3. Re-established weekly construction meetings, addressing delays and implementing corrective actions to keep the project on track.​

WhatsApp Image 2025-07-26 at 23.01.29_171324bf.jpg
WhatsApp Image 2025-07-24 at 11.15.24 AM.jpeg

INPEX Corporation

DURATION: January 2013 – December 2019 | Role: URF Fabrication/Construction Manager Manager | project: ICHTHYS LNG Project | Locations: Perth, Singapore, Indonesia

  1. Directed the entire fabrication, construction, and loadout process, ensuring work met safety and quality standards.

  2. Led risk assessments, HAZOP/HAZID sessions, and weekly safety meetings to promote a culture of safety and operational excellence.

  3. Team Leadership: Re-established weekly construction meetings, addressing delays and implementing corrective actions to keep the project on track.

  4. Managed over 10 million LTI-free man-hours while ensuring timely delivery of critical components despite the challenges posed by the COVID-19 pandemic.

LUKOIL Overseas Middle East Ltd

DURATION: April 2012 – January 2013 | Role: Project Construction Manager / Superintendent | project: West Qurna II Project | Location: West Basra, Iraq

  1. Led HSE initiatives to ensure compliance and safety during the construction of the pipeline and associated infrastructure.

  2. Timely Project Delivery: Acted as a liaison between LUKOIL and contractors, ensuring efficient project execution and delivery of milestones on time.Compliance:

  3. Ensured adherence to Iraqi regulations and international standards, mitigating risks associated with local and international requirements.Team Leadership:

  4. Facilitated the smooth progression of demining activities and operational coordination with other IOCs to ensure seamless project delivery.

On Site Gas Production
WhatsApp Image 2025-07-26 at 23.11.16_f5514e3a.jpg

BP Exploration Ltd

DURATION: September 2006 – March 2012 | Role: Company Site Manager / Site Representative| project: Block 18 Greater Plutonio & GERM Projects | Location: Soyo, Angola

  1. Managed subcontractor teams for the timely fabrication and delivery of subsea structures, ensuring adherence to BP’s strict 

  2. Coordinated offshore integration and loadout activities, ensuring timely delivery to offshore installations.

  3. Oversaw successful FATs and SITs, ensuring all subsea components met the required specifications and quality standards.

Technip

DURATION: APRIL 2006- SEPTEMBER 2006 | Role: Company Site Representative | project: QA-QC – Block 18 Greater Plutonio Project | Location: angola, Lobito

  1. Managed the quality control process for 23 umbilicals, ensuring adherence to project codes and standards.

  2. Conducted safety audits, risk assessments, and ensured contractor compliance with project procedures and quality standards.

  3. Documentation & Compliance: Successfully completed all NCRs/MRBs and closed out documentation prior to loadout.

WhatsApp Image 2025-07-26 at 23.08.14_398df04d.jpg
Create an image of oil and gas project (2).jpg

ExxonMobil

DURATION: September 2005 – April 2006 | Role: QA Advisor | Location: Eket, Port Harcourt, Lagos, Nigeria

  1. Led quality inspections and audits to ensure compliance with ExxonMobil's strict project standards.

  2. Reviewed and approved contractor QMS, ITPs, and project procedures, improving overall quality compliance.

  3. Ensured implementation of ExxonMobil’s quality standards across various contractors, achieving smooth project execution.

Capture.PNG
Contact :
Malcolm Garrington
Email: malgarrington@hotmail.com | Mob: (Egypt) +20 (0) 122 69 555 00 | (Indonesia) +62 (0) 812 705 3859 | (UAE) +971 (0) 58 564 8899 
DESIGNED FOR MALCOLM GARRRINGTON 
About Malcolm:
 

With over 40 years of experience leading complex, high-value projects across Oil & Gas, Wind Energy, Petrochemical, Pharmaceutical, Shipbuilding, and Power Generation industries, I am a results-driven Project, Site, and Construction Manager renowned for delivering projects on time, within budget, and with exceptional HSE performance. â€‹

I have a proven track record in managing offshore and onshore projects such as umbilical manufacturing, platform construction, subsea structures, and pipeline laying for top-tier companies like Total Energies, Formosa 2 Wind Farm, INPEX, and BP. 

​​